128 Council Future Office Accommodation - Preferred Option (PART A) PDF 1002 KB
Minutes:
The
Executive Member for Regeneration and the Director of Regeneration and Culture
submitted a report for the Executive’s consideration. The purpose of the report
was to provide information on the building options that had been explored for
the future accommodation of Council Staff and request approval for:
a) a departure from Centre
North East (CNE) being considered the preferred option due to changing
circumstances;
b) Fountains Court being
the preferred option for the future accommodation of staff;
c) the purchase of
Fountains Court; and
d) a delegated decision to
the Director of Regeneration and Culture, Richard Horniman, and the Director of
Finance, Ian Wright, with regard to expending the £200,000 contingency set
aside in the investment strategy, should it be required.
Fountains
Court was proposed as the preferred option, the key benefits of the option
being that:
a) The building had
recently been vacated by Firstsource, therefore purchasing and occupying the
building would prevent long-term vacancy, thus helping to meet the Council’s
regeneration objectives.
b) It offered the space
and layouts required for staff. At approximately 38,000 sq. ft it could
accommodate approximately 335 desks (5 per 10 people) and all previously
assumed services, with the exception of the Customer Centre which would remain
on the ground floor of Middlesbrough House. Furthermore, the building offered
the flexibility to extend with modular space if required in the future.
c) As the building would
be fully occupied by the Council, there was no requirement for the Council to
let the vacant space. That in contrast to the CNE option whereby the Council
would be taking a commercial risk on vacant space needing to be let.
d) A recent building
survey had confirmed the building was in sound condition and although it
required refurbishment, it would be possible to achieve a very high standard of
fit out and an excellent working environment for staff. As it was by far the
most economical option to purchase, a good proportion of the investment could be
allocated to ensuring a high internal specification.
e) It was by far the most
economically advantageous option. Further due diligence and survey work needed
to be undertaken to fully understand the costs, but it was anticipated that the
cost of the purchase and fit out of the building could be accommodated within
the original fit out budget for One Centre Square. If the detailed due
diligence subsequently identified that could not be achieved, a request for an
additional allocation of funding would be made prior to work starting. A saving
of up to £6.8m would be made when comparing Fountains Court to a generic new
build option of the same net internal area.
f) Moving to Fountains
Court would be achieved in a shorter timescale than the other options,
particularly any new build options. It was estimated staff could begin to
relocate there in autumn 2022.
If
approved, the next steps would be:
·
design
work and staff consultation to firm up the requirements;
· tendering and a mobilisation period for the ... view the full minutes text for item 128