Schedule (page
13)
Item 1 -
Former Natures World (pages 15 to 33)
Item 2 -
Land at Corner of Stockton Street/Commercial Street (pages 35 to 52)
Item 3 - 24
Church Lane (pages 53 to 65)
Item 4 - 2
Newport Crescent (pages 67 to 77)
Minutes:
The Head of Planning submitted plans deposited as
applications to develop land under the Town and Country Planning Act 1990.
20/0566/FUL
Erection of school building (Class F1) with associated outdoor-sports areas, parking
and landscaping at Land at Former Natures World, Sandy Flatts Lane,
Middlesbrough, TS5 7YN for Interserve Construction Ltd
The Head of Planning advised that planning
permission was sought for the erection of a Special Educational Needs (SEN)
school on a site to the north of Sandy Flatts Lane, at the southern end of the
former Nature’s World site.
The application was for the erection of a single
storey school building and the proposed scheme included the school building
along with the associated facilities and amenities, including car parking area,
multi-use games area, landscaping and boundary treatments.
Access to the SEN school would be taken off Sandy
Flatts Lane.
Following the consultation period, 25
representations had been received, including 22 letters of objection, 1 letter
of support and 2 other representations.
The two issues that required consideration by the
committee included:
·
The
development site being within a designated Green Wedge; and
·
The
transport implications.
The application site was allocated on the adopted
Local Plan Proposals Map as part of the Green Wedge. As well as the Green Wedge, the western side
of the site was identified as Secondary Open Space, and the eastern side of the
site was identified as Primary Open Space.
The general principles of those allocations was to protect the open and
green character and appearance and to resist most developments.
The Head of Planning commented that the benefits of
the proposed SEN school to the local community were considered to outweigh the
loss of part of the Green Wedge. It was
also concluded that the application site occupied a relatively small area of
the larger Green Wedge allocation and that the green character and open
appearance of the Green Wedge was not significantly harmed. It was considered
that if tree planting and landscaping were to be incorporated, along the south
western boundary of the site, that would reduce the visual impact of the
development on the Green Wedge.
In terms of transport implications, it was explained
that due to the nature of the school, the applicant had advised that most
pupils would arrive in either arranged taxis or minibuses. The number of pupils that would arrive in
private car was negligible and, as such, it was not envisaged that there would
be the type of parking issues that could be seen at other schools. It was
advised that there would be only 84 pupils on the school roll.
With regards to the proposal, it had been
identified that there would be a material impact at the junction of Sandy
Flatts Lane/Ladgate Lane. Further
investigation had identified that the issue at the junction was due to the
operation of the adjacent Blue Bell roundabout and the interaction of queues
between those junctions. Therefore, officers had negotiated and secured a
contribution of £22,500 from the school.
If approval was granted, that funding would be secured through a Section
106 legal agreement. The majority of the contribution would be used towards
feasibility, design and estimate studies for a mitigation scheme at the Blue
Bell roundabout. Funding to deliver the
mitigation scheme would then come forward proportionately from other sources
that could include other S106s, capital funding or grants.
It was also added that £2,500 of the £22,500
contribution would be used towards the provision of School Keep Clear markings
and zig-zags to assist in keeping the school frontage clear of any on-street
parking.
Whilst it had been analysed that there would be an
impact on the operation of the network, it was not at a level that would be
considered as severe, which was the test in the NPPF against which a refusal
could be considered.
The officer recommendation was to approve
conditionally, subject to the signing of a Section 106 legal agreement.
It was advised that condition 10, which was
outlined in the submitted report and related to the implementation of Traffic
Regulation Orders, would no longer be required due to the signing of a Section
106 legal agreement.
The Agent was elected to address the committee, in
support of the application.
In summary, the Agent explained that:
Objectors had commented on the impact of the
proposed development on highways, ecology and the loss of trees. In response to
those concerns, the Applicant had agreed to:
·
provide
£22,500 to mitigate the highways impact of the scheme;
·
retain
parts of the tree belt along the eastern boundary of the site, which would
assist in screening and limiting the visual impact of the proposed building on
the wider Green Wedge; and
·
provide
boundary planting for the southern part of the site to better integrate the
proposed development with the surrounding natural environment.
It was also added that the school was looking into
providing bat boxes and tubes within the building elevations and barn owl loft
boxes.
The following benefits were outlined by the Agent:
·
There
was an evident need for the proposed development, as the temporary
accommodation for the school was nearing capacity.
·
There
was a number of children with SEN that had been required to access education
outside the area.
·
The
number of children with SEN was increasing.
The proposed development would:
·
provide
high-quality, specialist education for those children with SEN;
·
reduce
the number of children being educated outside of the borough, which would
result in financial savings for the Local Authority;
·
would
create 64 direct and 96 indirect jobs during the construction period;
·
be
high-quality and sustainable; and
·
achieve
ecological net gains.
The Agent commented that the benefits of the
proposed school to the community, as a whole, outweighed the loss of the Green
Wedge.
A Ward Councillor was elected to address the
committee.
On balance the Ward Councillor was in favour of the
proposed development but shared the concerns of residents in respect of the
highway implications. It was commented that concerns had been raised in respect
of the width of Sandy Flatts Lane, it being insufficient to enable two-way
traffic flow and it included a blind bend where there had been a number of
accidents in the past. The Ward Councillor also questioned the spending of the
Section106 monies and expressed concern that a substantial amount was being
used to fund a mitigation scheme at the Blue Bell roundabout, rather than
mitigating the highway impact for nearby residents in the immediate vicinity of
the site.
A discussion ensured and Members discussed the
highway impact of the scheme. One Member suggested that the spending of the
Section 106 monies should be revisited to ensure that a sufficient amount of
work would be undertaken to mitigate the impact of the scheme on nearby
residents. In response, the Head of Planning explained that the majority of the
money would be allocated to a mitigation scheme at the Blue Bell roundabout as
the material impact at the junction of Sandy Flatts Lane/Ladgate Lane was due
to the operation of the roundabout and the interaction of queues between those
junctions.
The Head of Planning advised that although the
proposed development could be considered contrary to Policy E2 (Green Wedge),
it was considered that the benefits of the proposed special educational needs
school outweighed the loss of the Green Wedge.
Moreover, the site area was a relatively small area of the larger Green
Wedge allocation, which extended as far north as Linthorpe and as far east as
Marton Road. As for the lost piece of
Green Wedge, it was considered that tree planting and landscaping along the
south western boundary of the site would reduce the visual impact of the
development on the Green Wedge.
Overall, the officer recommendation was to approve
the application, subject to conditions and the signing of the Section 106
agreement.
ORDERED that the application be Approved on Condition for the reasons
set out in the report, subject to the signing of the Section 106 agreement and
further discussion regarding the allocation of funding.
20/0594/FUL
Social garden and community hub comprising of single storey building including
workshops, cafe and shop with parking and ancillary spaces at Land at Corner of
Stockton Street/Commercial Street Middlesbrough for Mr Denny
The Head of Planning advised that planning
permission was sought for the erection of a building and creation of a site to
provide a therapeutic support and opportunities hub, which allowed individuals
and groups of differing backgrounds and abilities to engage with outdoor
activities. The building planned to provide facilities for growing various
fruit and vegetables, a street-front shop and cafe, and craft workshops.
The building proposed was a single storey L shape
structure, parking would be provided along the eastern boundary served off
Commercial Street and the majority of the site was garden space. The boundary was intended to be created by a fence
interspersed with short sections of wall.
The committee were shown various images that
provided information on the location, floor plans, elevations and artist
impressions.
The Head of Planning advised that there had been no
objections to the application. It was explained that the reason the application
required consideration by the committee was due to the fact that the proposal
was a departure from the adopted Local Plan.
There were two issues that required consideration
by Members:
·
the
principle of the development; and
·
the
impact on the historical environment.
The proposal was in an area of Middlehaven
identified in the Local Plan for residential uses. However, the scheme was considered to be a
good fit with the wider aspirations for Middlehaven and planned to support the
delivery of the remainder of the area for a high quality residential
offer. In particular, the proposal would
provide an important buffer and transitional zone between the surrounding
industrial uses and any future residential development, enhancing the
environment and the attractiveness as a place to live. Importantly, the proposal was not considered
to have any adverse impacts upon the heritage assets of the Middlehaven area.
An important consideration had been how the
proposal would interact with the historic environment. The closest listed structures were the Old
Town Hall and Clock Tower (Grade II) and Customs House (Grade II) and those
were within a relative close proximity to the site, whereby their setting and
significance would be affected by the proposed development.
The application site was the north western most
plot within the Middlehaven Regeneration Area, a cleared and vacant site of
multiple development plots centred around the old Middlesbrough Town Hall. Stockton Street was located to the west,
Commercial Street to the north and a grouping of 2 storey historic buildings
known as 'My Place' to the east. Vacant
land was located to the south. The site
sloped up from a low northwest point to a high southeast point towards the
Middlesbrough Old Town Hall, which was located within the centre, and highest
part within the Middlehaven area.
The impact of the proposed scheme had been
considered against a number of key listed buildings in the locality and the
historic grid pattern of the Middlehaven area.
Importantly, the proposal was considered to have a positive impact on
the setting and long-term viability for the Old Town Hall. Overall, it was
considered that the proposed social garden would be a positive addition to the
Middlehaven area that respected the key principles of the grid pattern, did not
result in harm to the heritage of the area and planned to allow a modern
development to take place and frame the northwest corner of the Middlehaven
regeneration area.
The proposal was considered acceptable and it was
officer recommendation that the application be approved, subject to conditions.
In response to a Member’s query regarding parking,
the Principal Transport Engineer advised that 20 car spaces were proposed,
together with some cycle parking. Whilst the nature of development was bespoke,
a combination of using first principles with regards to staffing/visitors and
the Tees Valley Design Guide had demonstrated that the level of parking
proposed was realistic.
Members welcomed the proposed scheme, in particular
the role of the development in securing the wider aspirations for the
successful regeneration of Middlehaven.
ORDERED that the application be Approved on Condition for the reasons
set out in the report.
20/0623/FUL
Change of use from dwellinghouse (C3) to residential institution (C2 -
Children's Home) 24 Church Lane Acklam, Middlesbrough, TS5 7EG for GAC Family
Services Ltd
The Head of Planning advised that planning
permission was sought for the change of use of 24 Church Lane from a
dwellinghouse (C3) to a children’s home (C2 use). The site was a semi-detached
four bedroomed property located on a corner plot at the junction of Church Lane
and Thirlmere Avenue. The property was sited within a predominantly residential
area of Acklam.
The proposed children’s home planned to provide
accommodation for a maximum of three children between the ages of 8 and 18
years with 24 hour adult support, provided on a shift basis. Two members of
staff would be present at the premises with an Ofsted registered manager living
close by. There would be no external alterations to the property, with an
existing detached garage located within the curtilage of the property and a
large area of hard standing located to the east side of the property.
The Head of Planning advised that if Members were
minded to approve the application, a condition would be attached stating that
the premises shall be used for a three person children’s home and for no other
purpose, including any other purpose in Class C2.
Following the consultation process, there had been
46 letters of objection received. The objections related to an increase in the
volume of traffic and off-street parking, noise, light, privacy, litter,
anti-social behaviour/ crime, the impact on character and appearance of the
streetscene and the community, not suitable location for the use, no
requirement for the facility, devaluation of properties, wider consultation
should take place and not in accordance with the National Planning Policy
Framework (NPPF) and local plan policies.
There had been 2 letters of support received for
the proposal, which related to the proposal being a worthwhile cause and good
for the community in helping out children and keeping them safe from harm and
abuse with high-quality care and support in education and healthcare.
The proposal had been considered against national
and local policy. It was considered that the proposed use was acceptable in the
area of Acklam and the loss of a single dwellinghouse would not have a
significant impact on the Council’s Housing Delivery Strategy. It was
considered that the level of the intended use, as a three person occupancy
children’s home, and the fact there would be no external alterations to the property
meant the proposed change of use would have no significant impact on the
character and appearance of the area or the amenity of the neighbouring
properties.
The officer recommendation was to approve the
application, subject to conditions.
A representative of the Applicant was elected to
address the committee, in support of the application.
In summary, the Applicant’s representative
explained that:
·
The
number of children in care had risen by 28% over the last decade and was rising
due to lockdown, therefore, there was an increased need for top-level care
provision.
·
GAC
Family Services Ltd had the structure, knowledge and experience to provide
high-level quality care for children and young people.
·
The
property was considered to be within a sustainable location, which provided
good transport links and was close to local amenities, including a thriving
community hub.
·
All
children and young people would be screened to ensure that the service could
meet their individual needs.
·
An
Ofsted registered manager would be employed and two members of staff would be
present at the premises. Staff members would all be fully trained.
·
The
home would be subject to robust risk assessments and behaviour management
plans.
·
The
development would be fully regulated by Ofsted.
·
GAC
Family Services Ltd aimed to ensure that no noise, nuisance or disturbance
would be encountered by neighbouring properties.
A discussion ensued and several Members commented
on the Ofsted registration process. The Applicant’s representative commented
that if approval was granted:
·
the
property would be registered as a children's home and regulated by Ofsted;
·
the
home would be unable to open until it met Ofsted regulations;
·
the
Ofsted registered manager would live locally;
·
the
children’s home would build links with the Local Authority; and
·
the
duration of placements would be dependent on each child or young person’s care
plan.
In response to a Member’s query, the Applicant’s representative
explained that following a location risk assessment, given the lack of
provision in the area and the increasing number of children in care,
Middlesbrough had been identified as a suitable location to open a children’s
home.
A discussion ensued regarding the application, the
change of use and the potential impact on amenity of neighbouring properties.
The Applicant's representative responded to queries put forward by Members and
advised that a multi-agency response would be taken when dealing with
anti-social behaviour.
The Head of Planning explained that assessing the
change of use was separate to the process for registering and monitoring the
care home facilities. Registration and management of the children’s home were
not material planning considerations. Members were advised that the only issue
that required consideration by the committee was the impact of the proposal on
the surrounding area.
An Objector was elected to address the committee,
in objection to the application.
In summary, the Objector explained that:
·
47
residents had submitted objections to the proposal, which was a considerable
number.
·
The
area had already been subjected to a number of other developments, including
Acklam Hall, Tees Valley Hospital and housing developments.
·
The
site was a semi-detached dwelling and an elderly gentleman resided next door.
·
The
shift rota proposed, with sleep in or awake carers overnight, was likely to
have a detrimental impact on the occupier of the neighbouring property in
respect of noise and disturbance.
·
It
would be more appropriate for the children’s home to be located in a detached
dwelling, where the impact on neighbouring properties could be minimised.
·
The
large area of hard standing located to the east side of the property was
deceptive on the photographs shown to the committee and could only accommodate
two vehicles.
·
The
property was located on an extremely busy junction.
·
An
application considered by Leeds County Council in 2020 had been refused due to
the desirability of maintaining an area’s prevailing character and setting.
Similar reasoning could apply to the current application.
·
The
proposed location was a quiet residential area and the proposed commercial use
would impact on the character of the area.
·
The
change of use from residential to commercial would set a precedent in the area.
·
GAC
Family Services Ltd had three homes in Northampton and the current proposal
would be there fourth.
·
GAC
Family Services Ltd was a limited company, motivated by profit.
A Ward Councillor was elected to address the
committee.
In summary, the Ward Councillor explained that:
·
The
safety and wellbeing of every resident was paramount.
·
Previously,
the Local Authority had commissioned children’s homes through the NE12 Framework.
The 12 local authorities in the northeast had made a commitment to commission
placements through the framework to ensure that children and young people
gained access to high-quality placements. The Local Authority’s Children’s
Services now no longer operated within the framework and now commissioned
placements via the Tees Valley Framework.
·
GAC
Family Services Ltd did not appear to be a provider for either of those
frameworks. Therefore, aside from Ofsted, there would be no quality assurance
in place to ensure the safety of children and young people placed in the home.
·
There
was a need for the home to provide placements for Middlesbrough’s children and
young people.
·
The
shift rota proposed, with awake carers overnight, gave the impression that children
and young people placed may have complex needs, which could impact greatly on
the occupier of the adjoining property.
·
It
would be more appropriate for the children’s home to be located in a detached
dwelling.
In light of the comments raised, the Development
Control Manager advised that the needs of, and behaviours displayed by, the
children and young people placed in the proposed children’s home were not a
material planning consideration. It was also added that, if Members were minded
to refuse the application, a reason would need to be put forward. It was
explained that, from a planning perspective, there was a need to view the
proposal as a residential use in a residential area.
A discussion ensued and a Member commented that
although there was stigma attached to children’s homes, a high number of
properties in the borough had children and young people residing in them. It
was commented that the proposal would provide a home to vulnerable children and
young people in need. Another Member commented that with adequate supervision,
the impact on the neighbouring property, in respect of noise, nuisance and
disturbance, would be no more than another dwelling that was occupied by a
family with children.
ORDERED that the application be Approved on Condition for the reasons
set out in the report.
20/0629/COU
Change of use from retail A1 [E(a)] to hot food take away A5 (Sui Generis) at 2
Newport Crescent, Middlesbrough, TS1 5EP for Mr A Shahzad
The Head of Planning advised that planning
permission was sought to change the use of the premises from retail A1 (E (a))
to an A5 (sui generis) hot food takeaway use and for the installation of a flue
on the side elevation of the building. The application site was identified as
being within the retail sector of Middlesbrough town centre, where there was a
mixture of retail, restaurants, drinking establishments and professional
services.
The application site was 2 Newport Crescent, an end
of terraced commercial two-storey building located within the town centre. The
site was located within the defined retail sector of the town centre, as
identified within the local plan.
The proposal was for the change of use of the
ground floor into a hot food takeaway with the upper floor being utilised for
storage. The only external alteration proposed was a flue on the side elevation
of the building.
The application site was located within a
predominantly commercial area of the town centre with no residential properties
within the immediate vicinity.
Following consultation, three objections had been
received from the Ward Councillors, which primarily focused on the impact of
the proposal on public health.
The main considerations with the change of use
application were the principles of the development, the impacts on the
character and appearance of the streetscene, the impacts on the amenity of the
occupiers of the neighbouring premises and highway safety.
It was explained that planning permission for A
(hot food takeaways) was considered suitable where they were complimentary and
would not harm the principle function of the sector.
The Head of Planning advised that the proposal
complied with the Interim Hot Food Takeaway Policy, which aimed to manage the
location of hot food takeaways in certain locations. The policy stated that hot
food takeaways would only be permitted where:
·
the
total proportion of the A5 uses within the centre would not exceed 10%;
·
the
use would result in no more than 2 adjacent hot food takeaways or be within a
primary shopping frontage area; and
·
the
use should not be located within 400m walking distance of a secondary school.
The most recent monitoring data (March 2019) had
shown the town centre as having a proportion of 4% hot food takeaways. It had
not been possible to update the information in March 2020, using the
established methods, due to the Covid 19 lockdown restrictions. A desktop study
suggested that a maximum of 5.2 % of units could be hot food takeaways (based
on previous planning approvals). As such, the application would not result in
the proportion of A5 uses exceeding 10%.
The application site was not located adjacent to
existing A5 uses so would not result in more than 2 adjacent A5 uses within the
street, was located just outside of the primary shopping front area and was
located more than 400 metres from a secondary school. The proposal was
therefore considered to be compliant with the Interim Hot Food Takeaway Policy.
The Head of Planning advised that the application
was considered to be an acceptable form of development, fully in accordance
with the relevant policy guidance and there were no material considerations
that would indicate that the development should be refused.
The officer recommendation was to approve the
application, subject to conditions.
In response to Members’ queries, the Head of
Planning explained that:
·
There
was not a concentration of hot food takeaways in the general location of the
premises.
·
There
were no residential properties nearby.
·
The
Northern School of Arts provided post-16 education, therefore it was not
considered as part of the policy.
·
There
was a number of restaurants in the locality that were now operating as
takeaways due to the current Covid-19 crisis. It was confirmed that restaurants
had a different use class, therefore, they were not identified as takeaways in
the town centre. The extended permitted development for hot food takeaways
enabled restaurants to change their use class to allow for the provision of
takeaway food, but that was only temporary and would come to an end.
A Member expressed concern that:
·
The
applicant would be responsible for ensuring the waste receptacles were
collected.
·
The
proposal planned to remove the existing external bin store and provide an internal
bin store area within the building itself.
The Head of Planning commented that conditions on
the proposal required a noise and odour assessment that would ensure there were
no significant impacts on the amenity of neighbouring premises, in terms of
noise and odour. Members were advised that if there were issues in respect of
the disposal of waste, enforcement action could be taken.
In response to a Member’s query regarding updating
the Hot Food Takeaway Policy, the Head of Planning advised that the Local Plan
was currently being reviewed. As part of the review, the Hot Food Takeaway
Policy would be revisited, improved, developed and incorporated into the plan.
However, it was highlighted that there was a need for the committee to consider
the application in relation to the current policy framework.
In response to a Member’s query, the Head of
Planning advised that Greggs was classed as a retail use.
A discussion ensued and Members:
·
expressed
concerns in respect of the impact of the proposal on public health;
·
disputed
the definition of hot food takeaway;
·
expressed
concern with regard to the proliferation of hot food takeaways and other retail
units that sell hot food in the vicinity of the premises; and
·
commented
that the number of premises selling hot food was excessive.
Concerns were also expressed in respect of the
storage of waste. The Development Control Manager advised that the unit was an
existing premises and mismanagement of waste could be enforced against.
ORDERED that the application be Refused for the reasons outlined below:
In the opinion of the Local Planning
Authority the proposed Hot Food Takeaway will result in a proliferation of Hot
Food Takeaways and other fast food type outlets within the area which is
considered to be contrary to the principles of the Council's Interim Hot Food
Takeaway Policy which seeks to limit the number of Hot Food Take-away uses and
to maintain a predominantly retailing function to the town centre.
Supporting documents: